Structure Flooring
10 years ago
PortaFloor MAX was recently installed inside a Sprung® structure as a heavy duty reusable flooring system for inventory storage versus a gravel sub-base. The floor easily contoured to the structure’s unique shape by including 6” wide cable-channeled MAX pieces that enabled a custom fit. MAX provided a firm stable surface for the rolling service doors. In structure installations, MAX can be installed inside the structure or extended beyond the sides for a clean and durable foundation.