MAX Matting serves as Concrete Pad Replacement
10 years ago
The California National Guard needed a cost effective heavy duty flooring system that could withstand the loads of the equipment needed to house in their new permanent storage facility. PortaFloor MAX was installed within one day vs. a few weeks if they would have poured a concrete pad inside the facility.