Canadian Oil Fields
10 years ago
PortaFloor worked with Shell Oil and one of their on site engineers to provide a solution for a key equipment structures. Shell was looking for a heavy duty structure flooring solution that could replace concrete and reduce their installation and logistics costs. After several tests, PortaFloor MAX in a custom color was chosen as the best solution over the other flooring and matting systems that were tested. MAX reduced installation time, reduced logistics and costs and was able to support the heavy machinery in a cold weather location.